![]() ![]() Applications for LIHEAP are accepted from Octothrough June 30, 2021. ![]() Renters who have their heating costs included in their rent may also qualify. The Low Income Home Energy Assistance Program (LIHEAP) helps New Jersey households pay for heating costs and certain medically-necessary cooling expenses. Low Income Home Energy Assistance Program (LIHEAP): If you're having trouble affording your utility bills, there are some options for help.:ġ. No gas or electric public or municipal utility or privately or publicly owned water system shall collect any fee or charge imposed for late or otherwise untimely payments or service reconnections that have accrued, and will continue to accrue, during the Public Health Emergency. (Extended to Decemunder Executive order 246). ![]() ACH payments will come out of your account during the ten-day grace period.***Under Executive Order 229, no household in New Jersey can have its electricity, gas or water service shut off due to non-payment through June 30, 2021. ACH payment may be cancelled by the property owner in writing at any time prior to the quarterly tax due date. Property owners may fill out a short form and provide a voided check at the tax office which will allow the Township to make a direct withdrawal (at no additional cost to the property owner or the Township) from the taxpayer’s checking account or savings account. To make an online payment visit or call 1-86. We cannot accept Paymentus payments for Tax Sale items or to Redeem Tax Liens. Again, please carefully consider selecting this option.ĭo not mail credit card information to us. Using the e-check option, your payments may not be cleared until AFTER the 10-day mandated hold which can leave you subject to interest that is due on any payment received after the 10-day grace period of each quarter. While the Paymentus system also allows for the use of e-checks for an additional fee, please be aware of the following information: In accordance with National Automated Clearing House (NACHA) guidelines, there is a 10-business day hold on processing all e-checks which may affect the timeliness of the receipt of payment. Payments made through Paymentus are not received until the next business day and interest may be charged accordingly. Be advised, Paymentus charges a convenience fee of 2.5% for credit and debit. ![]() Online payments can be made through Paymentus Corporation. ![]()
0 Comments
![]() ![]() The player requires the Krone Bigpack to produce Straw bales and the Arcusin Autostack FS 63-72 to retrieve them. ![]() Straw can be found as a waste dragged by trails produced from any combine harvester. This allows the player to utilize slurry tanks and obtain free fertilizer along the way. Any type of Loader Wagon can collect grass and sell them at a biogas plant at a cheap price. ![]() Arcusin Autostack FS 63-72 can be used to retrieve them and dump them to the barn.
![]() ![]() Insufficient fluid pressure leading to cavitation within the pump. The remnants were safely recovered to the deck of the Allseas vessel.The root cause of many pump problems and failures can be traced to poor upstream, suction-side, pipeline design. Any size or shape of area within this 1.5 metre area, including the full 360-degree circumference of a tubular, can be cleaned.įinally, a 42” UCS Diamond Wire Saw completed six cuts, requiring only 44 minutes on average per cutting operation. ![]() The CRT is also able to clean a workspace of 1.5 metres in a linear pass before needing to be repositioned, outperforming comparable technologies. This enables the operators to see a graphical representation of the location on the pipe an essential performance enhancement in poor underwater visibility situations. With an innovative dual-nozzle design halving the debris removal time, the CRT is controlled by technicians topside using a bespoke SCADA control system. Once this work was completed, the Coating Removal Tool (CRT) effectively and rapidly removed 1.2 metres of concrete coating and 3LPP undercoating. The initial phase of the project involved the use of an 8in UCS Dredge System with a high-pressure Barracuda head to clear a channel under the damaged pipework. ![]() FL2 comprised an 18in (457mm) OD x 25mm WT carbon steel pipe grade SAWL 450 FDU, with a 3LPP coating and 50mm thick outer Concrete Weight Coat (CWC). The team was enlisted to cut out the damaged pipework in Flowline 2 (FL2) of the Total Laggan-Tormore gas fields in the UK North Sea, ahead of replacement operations. Ashtead Technology’s Mechanical Solutions specialists draw upon decades of experience supporting construction, decommissioning, inspection, repair, and maintenance scopes throughout the offshore energy industry. ![]() |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |